Fire Rebuild & Reconstruction in Sun Valley

Sun Valley fire rebuild that checks permit records and probes the yard for a filled pool or buried slab, since loose fill under a footing changes the design.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

A swimming pool filled in long ago can sit under a Sun Valley yard with no sign on the surface. If the new house, a garage or a patio cover lands over it, loose fill can settle beneath the footings. We look for one before quoting, through the permit history and a probe of the ground, because finding it later means stopping work and redesigning the foundation.

How we look for buried structures

The address's permit file can show a pool permit, or a demolition permit that mentions one, and an old aerial photo or survey can show its outline. On site we push a steel probe through the topsoil in a grid where the records point, feeling for a deck edge, broken concrete or soft fill. A small excavator can dig a test hole to confirm it. The same search turns up other buried slabs and old footings that could get in the way of new trenches.

What a buried pool means for the plan

If a pool was broken up and filled without compaction tests, the soils engineer will likely want the fill removed and replaced in compacted lifts, or the footings carried down to firm ground below it. Either path adds excavation, hauling and testing. Shifting the house or garage a short distance can avoid the spot altogether, where setbacks allow. LADBS reviews the soils report and the foundation design, and its inspector checks the trench bottoms. We price the remedy as a separate line.

About our Fire Rebuild & Reconstruction serviceEverything we build in Sun Valley

Fire Rebuild & Reconstruction in Sun Valley: questions

Fire Rebuild & Reconstruction in other cities

Plan your project in Sun Valley

Tell us about the property and what you have in mind. We reply with a written next step.