Structural Work in Arleta, One Stage at a Time

Structural repair in Arleta done in sequence: shoring, removal, footings, framing, then an inspection at every hold point before anything is closed up.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Nothing comes out of an Arleta house until something else is holding the load. That rule sets the order of a structural repair from its first day: temporary shoring, removal of damaged members, new footings, new framing, inspection, and only then cover. No stage starts until the previous one is finished and signed off, and the schedule we write is built around those hold points.

Shoring before removal

Temporary posts and beams go in under the ceiling or floor that the damaged framing carries, bearing on solid ground or on pads that spread the weight. With the shoring snug, charred or rotted members are cut out and hauled away. This is also when hidden conditions show, such as a top plate cut through for a duct or rafters resting on a wall never meant to carry them. The engineer sees those before new work is designed around them, so the repair fits the house that is actually standing there.

Footings, framing and the inspector

New footings follow where the design calls for them, dug to size, reinforced and inspected by LADBS before concrete is placed. Beams, posts and joists go in once the concrete has cured enough to take weight, and the shoring comes out only when the new members carry the load. Connectors, straps and shear panels are fastened to the schedule on the drawings. The inspector then reviews the frame with every face still open, and insulation or drywall goes up only after that approval is recorded.

About our Structural Work serviceEverything we build in Arleta

Structural Work in Arleta: questions

Plan your project in Arleta

Tell us about the property and what you have in mind. We reply with a written next step.