New Construction in West Hills, Window by Window

New house construction in West Hills with fiberglass window frames and low-E glass chosen by orientation, so seals stay tight under hard inland sun.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

For the windows of a new West Hills house, we specify fiberglass frames with dual-pane, low-emissivity glass. An inland lot takes hard sun, and fiberglass expands with heat at nearly the same rate as the glass it holds, so seals stay tight. The low-E coating turns back much of the sun's heat while letting light through, and tempered glass can be ordered where the fire code asks for it.

Why the frame material matters

Every frame moves as it heats and cools. Vinyl moves a great deal, which can work its corners loose over time under hard sun. Aluminum conducts heat straight through unless it has a thermal break. Fiberglass stays stable, takes paint, and does not soften in heat. We pair the frame with glass chosen by orientation: a coating that blocks more solar heat on the walls that face the afternoon sun, and a clearer coating where winter light is welcome. The energy forms record each window's ratings.

Installation and inspection

A well made window only performs if it goes in right. Each opening is fitted with a sloped pan at the sill first, the window is set level and shimmed at the points the manufacturer names, and flashing tape laps in order so water sheds outward. Low-expanding foam seals the gap without bowing the frame. LADBS checks the window ratings against the energy forms at plan review, and the inspector verifies the labels on site before they are peeled off. Screens, hardware and any tempered units are confirmed on the final walk through the house.

About our New Construction serviceEverything we build in West Hills

New Construction in West Hills: questions

Plan your project in West Hills

Tell us about the property and what you have in mind. We reply with a written next step.