New Construction in Lake View Terrace

New construction in Lake View Terrace, starting with the electrical service on the lot, LADBS permits and ember-resistant details where the parcel needs them.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

A cleared Lake View Terrace lot may still hold wiring that stays out of sight: a meter base, an overhead drop or an underground lateral, each sized for the house that came down. We open the meter enclosure, read the equipment ratings and run a load calculation for the new design. A shortfall can move the meter, reroute a trench and add a utility upgrade to the written scope, so we settle it before the site plan is drawn.

What a short service changes

With the load calculation in hand, an electrical designer draws the service plan and we file it with the utility. The utility designs its own side of the connection and decides what it will supply, which may be a heavier drop, a new underground feed in conduit, or a pad-mounted transformer that needs a clear spot on the lot. Each of those answers fixes where the meter sits, which way the trenches run and what room is left for a driveway or planting. We hold the foundation layout until that design arrives, then dig the utility trench before any paving goes down.

Permits and ember-resistant details

Plans for a new house here go through LADBS, the City of Los Angeles building department, for plan check and for the building and electrical permits. Some Lake View Terrace parcels fall within a mapped fire hazard zone, and a house on one of those may have to meet ember-resistance rules for the roof covering, attic and foundation vents, eaves, exterior walls and windows. The plan checker reviews those details beside the structural sheets, and the fire department may add its own review for some parcels. Inspectors then sign off each stage in the field, from the footings to the new service panel, before the final.

About our New Construction serviceEverything we build in Lake View Terrace

New Construction in Lake View Terrace: questions

Plan your project in Lake View Terrace

Tell us about the property and what you have in mind. We reply with a written next step.