New Construction in Eagle Rock

New Construction in Eagle Rock with the required solar array, battery wall space and roof layout settled early, then carried through LADBS plan check.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Where will the solar panels go, and how many will the house need? That question belongs on the first walk of an Eagle Rock lot, because the state energy code calls for a solar system on most new single-family homes. Its size falls out of the energy calculations for your design. We settle the roof layout around that figure early, so the array gets clear space facing a useful direction and the conduit route is framed in.

Making room on the roof

An array needs open roof planes kept free of plumbing vents, flues and skylights, with the fire setbacks the code requires along ridges and edges. We sort that out with your designer before the mechanical layout is fixed, then run conduit from the roof down to the main panel while the walls are still open. A battery, now or later, needs wall space close to the panel and an electrical service sized to match, so we reserve both. The energy compliance forms show the system, and the solar installer's drawings are checked against the building set.

Plan check through LADBS

Permits for an Eagle Rock house come from LADBS, the building department for Los Angeles, since the neighborhood sits inside city limits. Its plan checkers review the structural and energy pages, and the solar work normally carries a separate permit with its own inspection. Other city departments may need to sign off depending on the parcel. We collect those clearances, answer every correction list, and track the solar permit next to the building permit. After the final inspection, the utility reviews the installed system for interconnection before it starts producing power.

About our New Construction serviceEverything we build in Eagle Rock

New Construction in Eagle Rock: questions

Plan your project in Eagle Rock

Tell us about the property and what you have in mind. We reply with a written next step.