South Pasadena New Construction Starting With a Fresh Survey
Is the old survey of a South Pasadena lot good enough to design a new house from? Usually a fresh boundary and topographic survey is needed. Here is why.
Is the survey from when we bought the house good enough to build from? Standing on a cleared South Pasadena lot, the honest answer is usually no. An older survey may fix the lines, but a new house is designed from today's ground heights, corners checked in the field and every wall, tree and utility still standing. A fresh boundary and topographic survey gives the designer and the engineer that base.
What a new survey adds
The surveyor finds or resets the corner monuments and ties the lines to them, then shoots ground heights across the lot on a grid and at every break in grade. Walls, curbs, utility boxes, larger trees and the edges of neighboring structures near the line all go on the drawing. Height limits are measured from grade, setbacks from the lines and drainage from the spot heights, so each of those rules reads straight off this one sheet. Your old survey still helps, since any mismatch between the two is worth explaining early.
From survey to drawings
Once the survey is in, we lay the city's zoning standards for the parcel over it and mark the area a house can occupy. The soils engineer uses the same sheet to place borings, and the structural or civil engineer sets the finished floor and the drainage path from its spot heights. If a corner turns out to sit slightly off from what the old survey showed, the design moves with it now, on paper. The building department reviews the plans against that survey, and the surveyor may return to stake the footprint before excavation.
About our New Construction serviceEverything we build in South Pasadena
New Construction in South Pasadena: questions
Send any survey, permit record or plan you have from the old house, along with the address. We order the new survey and a soils report, check the zoning for the parcel, and compare the two surveys side by side. Anything that disagrees is settled before a designer starts drawing.
Survey, soils, design, engineering and city fees make up the first stage, priced on its own. Construction is priced next from the approved plans, following the order of the build. Each stage is written out before it begins, so you can see what the next step costs before you commit to it.
Our office runs that calendar. Survey work leads, soil borings follow, and the designer and structural engineer start from both results. If you already have an architect, they join the same calendar, and every consultant's dates and deliverables are tracked in one place.
New Construction in other cities
More we build in South Pasadena
Plan your project in South Pasadena
Tell us about the property and what you have in mind. We reply with a written next step.

