New Construction in La Canada Flintridge, Planned for Smoke Days

New construction in La Canada Flintridge planned for daily life and smoke days: an airtight frame, filtered ventilation and a bedroom set up as a clean room.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Day to day, a rebuilt La Canada Flintridge home has to handle two kinds of air. On clear days it should draw in fresh air without drafts or dust. When wildfire smoke drifts in, the windows stay shut and every room still has to be comfortable to breathe in. Some La Canada Flintridge parcels fall within mapped fire hazard areas, where ember-resistant vents, glazing and roofing may be required as well.

Clear days: steady fresh air

A house sealed well enough to keep smoke out also needs a planned supply of outside air. We frame and seal the envelope so air enters only where the design intends: through an energy recovery ventilator that runs quietly in the background, trading stale indoor air for filtered outdoor air while holding on to most of the heating or cooling. A blower door test after framing shows how tight the shell turned out, and the leaks it reveals are closed before insulation and drywall cover the walls. Kitchen and bath fans vent outdoors through dampers that shut when the fans stop.

Smoke days: closed up and filtered

When the outdoor air turns smoky, one control changes how the house runs. A motorized damper closes the ventilator intake, and the central air handler moves into continuous recirculation, drawing room air through a deep pleated filter again and again. That only works if the ducts were designed for the extra resistance of a dense filter, so the fan and the filter cabinet are sized at design. An air quality monitor in the hallway shows when to switch over and when to switch back. One bedroom can be fitted with a tight door and an outlet for a portable purifier as a clean room.

About our New Construction serviceEverything we build in La Canada Flintridge

New Construction in La Canada Flintridge: questions

Plan your project in La Canada Flintridge

Tell us about the property and what you have in mind. We reply with a written next step.