New Construction in Claremont

New Construction in Claremont wrapped against water: a lapped weather barrier, flashed window and door openings, and roof edges that keep rain off the walls.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

When a hard storm finally reaches an inland lot, it tests every opening in a new Claremont house at once. We treat the window and door openings as the weak points. Every rough opening is fitted with a pan that tilts outward and tape layered like roof shingles, so any water that slips past a frame is led back outside. The weather barrier over the sheathing follows the same downhill logic.

Layering the wall to shed water

Housewrap or a fluid-applied barrier goes on from the bottom up, each upper course overlapping the one below. Windows set into that layer with the head flashing tucked under the course above, and the jambs taped over the barrier. Where stucco meets the foundation, a perforated metal screed gives trapped moisture a way out. Penetrations for vents, hose bibs and lights get their own flashing blocks. Inspectors look at this work before the siding or stucco covers it, and we photograph each opening for your file, since that layer is hidden once the cladding is on.

Roof edges and the ground

Water that leaves the roof needs a planned path. Drip edge and gutters carry runoff off the eaves, and each downspout empties into a solid pipe or onto a concrete pad that keeps the flow well clear of the foundation. The finished grade around the house drops away from the walls. On the roof, valleys and wall intersections get step and kickout flashing, so water does not run behind the siding where the roof meets a wall. The Claremont building department reviews the drainage on the site plan, and we build to that plan.

About our New Construction serviceEverything we build in Claremont

New Construction in Claremont: questions

New Construction in other cities

Plan your project in Claremont

Tell us about the property and what you have in mind. We reply with a written next step.