New Construction in La Verne, Energy Forms That Match the Plans

The La Verne plan checker compares a new house's energy forms with its drawings: wall and roof insulation, windows, equipment and the required solar array.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

When the La Verne building department reviews a new house, the energy compliance forms get read against the drawings. The plan checker wants the insulation values, window ratings, heating and water heating equipment and the solar array on the forms to appear the same way on the plans. A mismatch brings a correction. We have the energy consultant model the house we will build, then check each entry before submittal.

Matching forms to sheets

The state energy code lets a house comply by meeting a fixed list of measures or by modeling the whole design. Either path produces forms that list what was assumed: wall and ceiling insulation, window performance, duct location, the heat pump or furnace and the water heater. New homes also need a solar electric system sized by the code's method, unless the roof qualifies for an exception. The reviewer checks that the sheets show each assumed item, and that notes on the plans call for the field tests the forms require.

Verification in the field

Some measures cannot be judged by eye, so a certified third party rater tests them. Duct leakage, fan airflow and the quality of insulation installation are typical examples. The inspector checks the insulation before drywall, and the rater's registered results must be on file before the final inspection can pass. We schedule the rater alongside the inspections so testing happens while ducts and wall cavities are still open, and we keep the signed forms with the permit card for the final visit.

About our New Construction serviceEverything we build in La Verne

New Construction in La Verne: questions

Plan your project in La Verne

Tell us about the property and what you have in mind. We reply with a written next step.