Fire Rebuild & Reconstruction in Claremont

Claremont fire rebuild with roof-to-wall joints flashed in shingle order: step pieces, a kickout at the eave, lapped wrap and a water test before siding.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Rain that runs down a roof and meets a wall is the water most likely to get inside a rebuilt Claremont house, so we treat every roof-to-wall joint as a small project of its own. Each one gets bent metal pieces tucked under the roofing, a diverter at the low end that throws water into the gutter, and house wrap lapped down over the metal so every layer drains onto the one below.

Shingle order at the wall line

Flashing works by overlap, the way shingles do. A single long strip bent along the joint can trap water and push it sideways, so the roofer sets one short bent piece with each course, the upper piece always lying over the lower. Where the roof stops short of the wall at its bottom edge, a diverter turns the flow out past the siding line. Leave that piece out and water rides down the wall face into the corner framing, where rot can spread quietly for a long time before any stain shows indoors.

Wrap, siding and a check with the hose

Once the metal is set, the water-resistive barrier on the wall comes down over its upright leg, never tucked behind it, and the siding or plaster stops a small gap above the roof surface so it cannot wick moisture. Where a tall wall rises above a long run of roof, the flashing legs are made taller to handle the extra water. Before cladding hides anything, we run water over each joint with a hose and watch for drips from inside the attic, then fix what shows.

About our Fire Rebuild & Reconstruction serviceEverything we build in Claremont

Fire Rebuild & Reconstruction in Claremont: questions

Fire Rebuild & Reconstruction in other cities

Plan your project in Claremont

Tell us about the property and what you have in mind. We reply with a written next step.