New Construction in Covina

New Construction in Covina with radiant barrier roof sheathing and a sealed, insulated attic plan that keeps hard summer sun from loading heat into the rooms.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

For the roof deck of a new Covina house, we specify radiant barrier sheathing, the panels with a foil face turned down into the attic. Hard sun on an inland roof heats the shingles and the deck, and that heat radiates down toward the ceiling. The foil reflects much of it back, which keeps the attic cooler and the air conditioning working less. It costs little extra at framing and cannot be added easily later.

How the roof assembly works together

The radiant barrier is one layer in a set. Above it, a cool roof shingle or tile with a light reflective rating sends some sunlight back before it is absorbed. Under the deck, the attic either vents through soffit and ridge openings or is sealed and insulated at the roof line, with the ducts kept inside the conditioned space. The energy compliance forms model the whole assembly, and the choice affects what the state energy code asks of the walls and windows. We set the approach with your designer early so the energy forms and the framing plans match.

Permits and inspection in Covina

The Covina building department checks the full drawing set for a new house, energy pages included. Energy compliance on new homes often brings a third-party inspector into the process, a certified rater who tests duct leakage and checks insulation installation before drywall. We schedule those tests along with the city inspections so neither holds the other up. The sheathing is visible to the frame inspector before the roof covering goes on, and we keep photographs of it, so the record of what is in your roof stays with the house.

About our New Construction serviceEverything we build in Covina

New Construction in Covina: questions

Plan your project in Covina

Tell us about the property and what you have in mind. We reply with a written next step.