ADU Construction in Claremont

Claremont ADUs with a roof sloped to send rain away from the main house and the footings, gutters sized to match, permitted after a house fire.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Rain that hits the roof of a Claremont backyard unit has to land somewhere, and we decide where before the roof shape is drawn. A pitch that drains toward the main house dumps water into any narrow strip between two foundations. We slope the roof toward open yard, size the gutter for the full plane and plan where each downspout lets go. On a cleared lot, the roofs of both buildings can be planned to work together.

Shape, slope and covering

A gable splits runoff between two eaves. A single-slope roof sends all of it to one edge, which simplifies the gutter but loads one downspout. We match the covering to the pitch, with shingles or tile on steeper planes and a membrane rated for low slopes where the roof flattens. Underlayment covers the whole deck, drip edge laps into the gutter so water cannot wick behind it, and step flashing sits at every wall where a porch or bump-out roof meets the siding.

Where the water goes after the gutter

Each downspout ends at a splash block, a buried drain line or a planted basin, chosen for the soil and the space. If the lot slopes toward a neighbor, the drainage is led along the property line so runoff stays on your side. The roof plan, the downspout points and the grading notes sit together in the permit set that Claremont reviews. Inspectors see the roof before it is covered and the drain lines before backfill, and each stage of the unit has its place in the written scope.

About our ADU Construction serviceEverything we build in Claremont

ADU Construction in Claremont: questions

ADU Construction in other cities

Plan your project in Claremont

Tell us about the property and what you have in mind. We reply with a written next step.