Claremont Structural Work That Keeps Water Off the Footings
Foundation work in a Claremont fire repair comes with a plan for water: gutters, closed downspout pipe and grading that keeps runoff away from footings.
Water that pools against a footing softens the soil beneath it, and soft soil lets a corner of the house settle. When a Claremont fire repair includes foundation work, the plan also says where roof water goes: gutters sized for the rebuilt roof, downspouts carried in closed pipe to a point well clear of the footings, and soil around the house shaped to fall away from the walls.
Grading and downspouts
Soil beside the foundation should fall away from the house for the first stretch out, and paving should slope the same way. Where cleanup or heavy equipment has flattened that fall or pushed soil up against the siding, we regrade it and pull the soil down below the weep screed so the base of the wall can drain. Downspouts feed solid pipe that carries water to a dry well, a swale or the street as the lot and the city allow, and every joint in that pipe is sealed so the water stays inside it until it gets there.
Keeping the footing and sill dry
Where a footing is repaired or added, its outer face can be coated before backfill, and a perforated drain in gravel can run along it if the soil holds water. Above it, any sill that gets replaced is treated lumber bedded on a foam gasket that stops moisture wicking up from the concrete. At the base of each exterior wall, flashing and the water-resistive barrier lap over the foundation edge so water running down the wall drops clear of the sill. Footing inspection comes before the pour, and the grading and downspout runs get a final walk before the job closes.
About our Structural Work serviceEverything we build in Claremont
Structural Work in Claremont: questions
Begin at the bottom edge of the house, where water does slow damage. We probe the sill and the base of the studs along each outside wall, look for cracks or settlement in the foundation, and check that soil and paving fall away. Inside, the walls and attic the fire reached get the same probing for char and rot, and both sets of readings go to the engineer.
Footing repairs and new footings need one, and so does underpinning a corner that has settled. Replacing beams, posts or headers, or keeping framing the fire charred, falls in the same group. A soils engineer may join if the ground under a footing looks soft. Regrading and downspout work need no calculations, though the building department may review drainage on the site plan.
Adding them during foundation work saves opening things twice. New anchor bolts or retrofit plates can go into a repaired footing while it is exposed, and the open walls above can be braced with nailed sheathing and straps at their ends. The engineer draws anchors and bracing as one system, so the inspector sees the chain from footing to roof at the frame inspection.
More we build in Claremont
Plan your project in Claremont
Tell us about the property and what you have in mind. We reply with a written next step.

