New Construction in Arcadia, From the Slab Up
Arcadia new construction where everything buried under the slab is placed, tested and inspected in sequence before the vapor retarder and the pour.
Concrete buries everything beneath it for good, so on a cleared Arcadia lot the work under a new slab follows a strict order. Footing trenches are dug and inspected first. Drain and waste lines go in next and sit full of water while the inspector looks for leaks. Conduit sleeves for floor outlets and any island follow. Once those sign-offs are in hand, the vapor retarder goes down and the pour begins, with framing waiting on the cured slab.
Trenches and what goes in them
Layout comes from the surveyor's stakes, checked against the setbacks on the approved plans. Trenches are dug to the depth and width the soils engineer set, and the engineer may look at the bottoms before the city inspector checks steel, hold-down anchors and depth. Under-slab plumbing is laid with its fall set by laser, then filled and held so any leak shows. Electrical conduit for floor boxes is placed at the same time. Every pipe and sleeve rising through the future slab is measured against the wall layout, since a stub-up in the wrong spot means cutting concrete later.
The pour and after
Gravel and a heavy vapor retarder go over the compacted base, seams taped and every pipe penetration sealed. The inspector signs the foundation card, and with that signature the trucks are called. Fresh concrete is kept damp while it cures, and framing begins after the slab can take the load the engineer allows. Rough plumbing, electrical and mechanical are then inspected together, insulation after them, and drywall after that. Each sign-off goes into the job file with photos, so the order of work stays documented through the final inspection.
About our New Construction serviceEverything we build in Arcadia
New Construction in Arcadia: questions
How trucks will reach the lot and where a temporary power pole can stand. The order of work leans on access, because concrete trucks, a lumber drop and a portable toilet all need a spot. Add a survey, the soils findings and the zoning limits on height and coverage, and say if you want floor outlets or a kitchen island, since their sleeves go in before the pour.
Layout and trenching, the underground runs, the slab, the frame, roofing, the rough trades and finishes each get a written price of their own. That price is written once the city has approved the plans, and the inspection that closes each stage is named beside it. Street connections made by the utilities appear apart from our work, with each provider named.
You get one calendar from our office that shows when the surveyor, the soils engineer and the structural engineer each start and what each is waiting on. Both the surveyor and the soils engineer return during the build, the first to set layout stakes and the second to check open trenches. If the inspector wants the engineer's letter on a trench, it is on site before the visit.