New Construction in Monrovia, Dry at the Base

Monrovia new construction detailed to keep the base of each wall dry, with foundation clearance, a weep screed above grade and a bare rock band.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Rain that splashes off a walk or runs across a yard reaches a new Monrovia house first at the base of its walls. That joint between foundation, frame and soil gets layered protection: concrete that stands clear of the ground, a weep screed that lets the plaster drain, and finished grade falling away on every side. On a lot inside the mapped fire hazard zones that take in parts of Monrovia, the same band of ground stays bare of anything that burns.

Clearances at the foundation

Code sets minimum heights here, and we build past them where the design allows. The foundation wall rises at least 6 inches above finished grade, which keeps soil and splash off the wood sill. That sill is preservative-treated where it sits on concrete, and a sill gasket closes the gap beneath it. The weep screed at the foot of the plaster stands clear of soil and of paving, so water that gets behind the finish can leave. Grade then drops away from the house for the first several feet, and the inspector checks that fall before final.

The bare band

The strip right beside the walls is finished hard and bare, in crushed rock or pavers over a weed barrier, with no bark or shrubs. Splash from a sprinkler soaks through and away, and an ember landing on rock has nothing to light. Sprinkler heads point away from the siding. Roof water travels in solid pipe from each downspout to the outlet the drainage plan shows, so it does not pool at the foundation. Planters built against a wall stay out of the design, because wet soil held against framing leads to rot.

About our New Construction serviceEverything we build in Monrovia

New Construction in Monrovia: questions

Plan your project in Monrovia

Tell us about the property and what you have in mind. We reply with a written next step.