New Construction in Temple City, Cement Plaster Walls
Temple City new construction finished in cement plaster with the color mixed into the top coat, over building paper and lath to take sun, heat and storms.
Color that sits inside the plaster has no paint film to peel, so we tint the finish coat on a new Temple City house. Cement plaster goes on in scratch, brown and finish coats over paper and metal lath. Hard sun can bleach a painted wall and dry heat can lift paint at its edges. A tinted coat weathers evenly, the plaster itself does not burn, and the paper behind it carries off rain a hard storm pushes through a crack.
The layers, from frame to finish
Over the sheathing go 2 layers of grade D building paper, then galvanized lath fastened into the studs. The scratch coat is raked so the brown coat can grip it, and the brown coat is kept damp while it cures, since plaster that dries too quickly tends to crack. A weep screed at the base of each wall lets water behind the plaster drain out above the soil. Control joints break up long runs so any movement shows as a straight line in a place we chose. The finish coat goes on last, its pigment measured by the bag so each batch matches the one before.
Openings, inspection and upkeep
Windows and doors are flashed into the paper layers before any lath goes up, lapped so water always runs outward. The city building inspector checks the paper and lath ahead of any plaster, and nothing is troweled on until that approval. Vents, light boxes and hose bibs get their own flashing or sealed trim pieces. After move-in the walls ask for little: a look at the control joints after a big storm, a hose rinse when dust builds up and a fresh color wash much later if the tone has drifted. Hairline cracks are cosmetic and close under the next wash.
About our New Construction serviceEverything we build in Temple City
New Construction in Temple City: questions
How close the walls will come to each property line and what will sit against them. A wall near a side line carries fire separation rules of its own, and planters or paving at the base decide where the weep screed lands. Soils findings, a boundary survey and the height and coverage zoning allows fill in the rest.
Exterior plaster gets its own lines in the estimate: paper and lath, the base coats, the tinted finish and the trim pieces around openings. Those lines sit within a build price taken from the approved drawings and laid out by stage, so a texture or color change shows its effect on the total. Design and consultant fees are priced earlier.
Consultants are booked in a fixed order, surveyor ahead of soils and soils ahead of structural, with every date kept on one calendar in our office. The structural sheets locate the shear walls, which tells the plaster crew where heavier nailing sits under the lath. If plan check questions a sheet, its author answers and we track the revision until it is approved.
New Construction in other cities
More we build in Temple City
Plan your project in Temple City
Tell us about the property and what you have in mind. We reply with a written next step.

