Rebuilding in Arcadia, Los Angeles County

Rebuilding an Arcadia home after a fire

Arcadia fire rebuild run in fixed stages, the same as in Sierra Madre, Monrovia and Temple City: assessment, scope, engineering, permits, then the build.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add what you are interested in, your first name and a phone number or an email.

Arcadia sits beside Sierra Madre, Monrovia, Temple City and San Marino, and a rebuild in any of them passes through the same stages with us: an assessment of the cleared lot, a written scope, engineering, permits, then the house from foundation to finish. What differs from one to the next is the city that reviews the plans and whatever amendments it has written into the state code.

Stages that stay fixed

Assessment comes first, with the soils engineer, the surveyor and our own walk of the lot gathered into one report. The scope follows, written room by room and priced in building order. Engineering then sizes the foundation, the shear walls and the roof framing, and the set goes to plan check. After the permit, work runs from footings to framing, rough trades, insulation, drywall and finishes, and each stage closes with its inspection before the next one opens. You receive the same written update at every one of those points.

Where the city changes things

Inside Arcadia city limits, the City of Arcadia reviews and inspects the work, while El Monte, San Gabriel and Temple City each take their own permit applications, so forms, fees and the way inspections are booked can vary. A neighboring city may also have adopted amendments to the state code, on sprinklers or roof coverings for example, and those get drawn in at design. Our scope names the reviewing jurisdiction on its first page, so the code edition and the office behind every requirement are clear before the set is submitted.

Start your Arcadia project with a lot visit

Send the address and where things stand. We reply with the next step.