New Construction in San Gabriel, With a Kitchen Planned for Daily Use

A kitchen in a new San Gabriel house planned for daily use: clear work zones, counter space beside the cooktop and sink, storage in reach and a vented hood.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

A kitchen in a new San Gabriel house has to cope with breakfast in a hurry, a full dinner and the dishes after. We plan it around how food moves: from the refrigerator to a stretch of counter, to the sink, to the cooktop and out to the table. Counter space sits beside each appliance, the walkways stay wide enough for two people, and a hood carries cooking smoke outside.

Zones and clearances

We place the sink, the cooktop and the refrigerator so no busy path cuts across them, and give each a landing area for a hot pan or a bag of groceries. An island works when the aisle around it leaves room for an open dishwasher and a person passing. Drawers below the counter keep pots within reach, and a tall pantry beside the refrigerator holds dry goods. Trash and recycling sit by the sink where scraps land, and outlets along the counter follow the spacing the electrical code sets.

Air, light and what goes behind the walls

A range hood ducted outdoors pulls grease and steam from above the cooktop, sized to the burner output and sealed where it passes through the wall or roof. Large hoods can call for makeup air so the house does not pull exhaust back down a flue. Undercabinet lights brighten the counters where ceiling fixtures cast a shadow. Blocking goes into the framing before drywall for upper cabinets and open shelves, and the gas line or the 240 volt circuit for the range is set before the cabinets arrive.

About our New Construction serviceEverything we build in San Gabriel

New Construction in San Gabriel: questions

Plan your project in San Gabriel

Tell us about the property and what you have in mind. We reply with a written next step.