New Construction in San Marino, Measured Against the Wires

Before pricing a new San Marino house, we measure any overhead power lines near the lot, since their clearance sets where an upper floor and a crane can go.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Where power reaches a cleared San Marino lot through overhead lines, their height and position are the first thing we measure. A laser reading from the ground gives the height of each wire at the property line and over the planned footprint. Those readings decide how close an upper floor can come, where a crane or boom truck can set up, and whether the service drop to the new house has to move before framing starts.

Reading the lines

We note which wires are the utility's distribution lines on the poles and which is the service drop that fed the old house, since the clearance rules for each differ. Distribution lines need far more room around them, and a roof, deck or scaffold may not come within that distance. We also record the position of each pole close to the lot and whether a guy wire crosses the lot. The power company is asked early whether the drop can be raised, rerouted or moved underground, and what it needs from us to do so.

How the readings shape the plan

An upper floor or a tall roof near a line may need to step back, or the utility may need to relocate or cover a wire before framing reaches that height. Cranes and concrete pumps have to stay outside a set distance from energized lines, so their position on delivery days is planned now. Moving the service underground means a trench, a conduit and a new meter location, all fitted to the utility's own calendar. Each item goes on the quote as a separate line, and the building department sees the final service layout with the electrical plans.

About our New Construction serviceEverything we build in San Marino

New Construction in San Marino: questions

Plan your project in San Marino

Tell us about the property and what you have in mind. We reply with a written next step.