Toluca Lake ADU Construction With a Butterfly Roof

Toluca Lake ADU construction with a butterfly roof whose two planes fold down to a lined center valley and drain through one end wall to a buried yard line.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

A butterfly roof on a Toluca Lake ADU tips both of its planes inward, so the rain they catch meets in a center valley and runs to one end of the building. There a scupper carries it out through the wall. The high outer eaves leave space for a band of clerestory glass, which brings daylight into the unit from above the construction fence that will surround the main house as it is rebuilt.

A valley built to keep moving

The valley is the one part of this roof where water gathers, so its framing is tapered to give it a constant fall toward the outlet end. Over the deck we lay a self-adhered membrane, then reinforce the valley with a second ply or a formed metal pan, lapping each layer so the upper piece always covers the lower one. The scupper is a soldered box set through the end wall, with its flange tucked under the valley lining. Beside it, a backup scupper with a slightly raised sill gives a storm somewhere to go if leaves have packed the first.

Carrying the water across the yard

Below the scupper, a conductor head collects the stream and feeds one downspout, and the downspout empties into solid pipe buried on a steady fall to a drain outlet or a dry well. Because the whole roof empties there, that pipe is sized for a heavy storm off both planes. A cleanout at its base lets the line be flushed. Where a dry well is used, its location and depth follow the soils report and keep it clear of the unit and of the future house footings. LADBS reads the drainage route as part of the unit's permit set.

About our ADU Construction serviceEverything we build in Toluca Lake

ADU Construction in Toluca Lake: questions

Plan your project in Toluca Lake

Tell us about the property and what you have in mind. We reply with a written next step.