ADU Construction in San Dimas

San Dimas ADUs planned around how roof trusses, lumber and concrete reach the rear of a cleared lot, with staging set before the main rebuild.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

We stand at the curb of a San Dimas lot and work out how roof trusses will reach the rear before a backyard unit is drawn. Trusses are long and cannot bend around a corner, so the route needs a straight run or room for a small crane to lift them over. On a lot cleared after a fire, that path is open, and the rebuild order decides how long it stays clear.

Crane, carry or cut on site

A straight driveway to the back lets a truck drop trusses beside the slab. Where the route turns, a crane can set them from the street, which needs approval to use the lane and a swing path clear of overhead wires. If neither works, the roof is framed with rafters cut on site, which takes more labor at the frame stage. We price whichever method fits the lot and put the reasoning in the written schedule, so the choice is visible before the order is placed.

Staging two buildings on one lot

When the ADU and the main house rise together, the lot is divided before the first delivery. One area holds covered lumber, another stays clear for concrete, and the lane to the rear is kept open until the roof of the unit is on. San Dimas reviews the site plan with that lane drawn, and inspections follow every stage of the build. If the main house goes first, we leave a gap in its fencing and planting so materials for the unit can still pass through.

About our ADU Construction serviceEverything we build in San Dimas

ADU Construction in San Dimas: questions

ADU Construction in other cities

Plan your project in San Dimas

Tell us about the property and what you have in mind. We reply with a written next step.