ADU Construction in Cerritos

Cerritos ADUs under a gable roof: gutters on both eaves, downspouts led to the yard drain, a Class A covering, and a permit from the city.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

A gable roof sends rain off a Cerritos backyard unit in opposite directions, so both long eaves get gutters and each corner gets a downspout. We decide where every downspout lands before the roof is drawn: on splash blocks over planted ground, or into solid pipe that carries the water toward the street. Either way, it has to stay clear of the property line and of the replacement house still to come.

Covering, flashing and edges

Asphalt shingles or concrete tile, each available with a Class A rating, suit a gable at a moderate pitch. A drip edge at each eave sits under the underlayment so water drops cleanly into the gutter, and the rakes get their own metal edge over it. Skylights and vent pipes get their own flashing kits, and wherever a wall meets the roof, step flashing goes in with counterflashing over it. Inland sun and dry wind wear on sealant first, so we favor metal flashing details that stay tight without caulk.

Where the downspouts go

Water from both eaves is a lot to put in one place, so we split it. Downspouts on the yard side can empty onto splash blocks where the ground falls away and takes water well. On the side facing the property line, they tie into solid pipe that runs to a curb outlet or a dry well. Finished grade falls away from the unit's walls on every side, and the pipe is routed outside the future footprint of the main house. Plan review covers this drainage, and the final inspection includes it.

About our ADU Construction serviceEverything we build in Cerritos

ADU Construction in Cerritos: questions

Plan your project in Cerritos

Tell us about the property and what you have in mind. We reply with a written next step.