Fire Rebuild & Reconstruction in Cerritos

Cerritos fire rebuild with a patio cover that keeps rain off the house wall: a flashed ledger, a draining roof, posts on raised bases and a slab pitched away.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Where a patio cover joins a rebuilt Cerritos house, the ledger board bolted to the wall is the place water most wants to get in. We flash over the top of that ledger and lap the flashing under the weather barrier above it, so rain running down the wall passes over the joint. The cover's roof slopes away from the house to a gutter, and the patio slab below pitches outward too.

The ledger and the cover roof

The ledger is bolted through the sheathing into the framing at spacing the engineer sets, with spacers or a membrane behind it so wood never traps water against the wall. Metal flashing bends over the top edge and runs up behind the wrap. A solid cover gets underlayment and roofing like the house, at a pitch that drains, and a lattice cover still needs its ledger flashed. The gutter at the outer edge feeds a downspout piped to an approved outlet.

Posts, slab and inspection

Posts stand on metal bases that lift the wood above the concrete, anchored to footings sized for the load and the wind. The patio slab falls away from the house so rain blown under the cover drains outward, and it stays below the weep screed or siding line. Where the slab meets the house, a joint filler keeps water from running down along the foundation. A patio cover attached to the house is usually part of the building permit, and the inspector sees the ledger before it is covered. Every piece carries its own price.

About our Fire Rebuild & Reconstruction serviceEverything we build in Cerritos

Fire Rebuild & Reconstruction in Cerritos: questions

Fire Rebuild & Reconstruction in other cities

Plan your project in Cerritos

Tell us about the property and what you have in mind. We reply with a written next step.