ADU Construction in Hacienda Heights

Hacienda Heights ADUs on burned lots start with soil samples for ash metals, lab results read against natural levels, then county plan check.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Soil samples come first on a Hacienda Heights lot where a house has burned and been cleared. Ash from a house fire can leave metals such as lead and arsenic in the ground, so before a backyard unit is placed, we sample where the house stood and the spots the unit and its trenches might use. A lab reports on each sample, and the results tell us whether that ground is ready to dig.

Reading the lab results

Each result is compared with the levels found naturally in soil of the region, a figure the lab or the cleanup program supplies. Where a sample comes back high, the usual answer is to remove more soil from that patch and test it again. If the debris removal already produced samples, we read those reports first and test only where gaps remain. Clean results let footing trenches and utility lines go wherever the plan needs them. While work goes on, bare soil is kept damp or covered, so dust does not carry ash past the lot line.

County review on an unincorporated lot

With no city government of its own, Hacienda Heights falls to Los Angeles County Public Works for permits, plan review and field inspection of a new unit. Plan check reads the unit itself, from footings and framing to energy and the utility routes. Before that, a lot cleared after a fire may need its debris removal signed off, and we gather that clearance with the soil results so the application goes in complete. Inspections then follow the unit from the footing trenches to the final, and where soil was replaced, the footing inspection confirms firm, compacted ground under the concrete.

About our ADU Construction serviceEverything we build in Hacienda Heights

ADU Construction in Hacienda Heights: questions

Plan your project in Hacienda Heights

Tell us about the property and what you have in mind. We reply with a written next step.