Structural Work in Mission Hills, Cavities Traced

Unblocked wall cavities can carry fire heat into an attic. In Mission Hills we trace that char to its end, add fireblocking and repair framing under LADBS.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

A wall cavity with no fireblocking at the ceiling line can carry heat from a burned room straight into the attic. When fire repair in a Mission Hills house turns up that open path, the scope grows. The char has to be traced up the studs to the top plates and rafters it may have reached, and code-required blocking goes into each cavity before the wall is closed again.

Soffits, chases and the attic

Dropped ceilings over kitchen cabinets, pipe chases and the space around a fireplace flue are other routes heat can take, since they can connect to the attic or the floor above without a break. We open each one near the burned area, follow any soot or char to where it stops, and measure what remains of the wood it touched. Members the engineer judges too weak are replaced or reinforced, and new fireblocking of lumber, gypsum board or mineral wool closes each route. Each closed route is photographed for the record.

LADBS and the written change

LADBS, which permits work in Mission Hills, reviews the engineer's details for any replaced studs, plates or rafters, and its inspector checks fireblocking and framing together before insulation. When tracing the char carries the repair into a room the first scope did not cover, you see that change in writing with its cost before the wall is opened further. The same openings can show other hidden faults, such as a joist cut for a light fixture or a plate notched for a pipe, and each one joins the written list.

About our Structural Work serviceEverything we build in Mission Hills

Structural Work in Mission Hills: questions

Plan your project in Mission Hills

Tell us about the property and what you have in mind. We reply with a written next step.