Structural Work in Temple City With Treated Framing

Borate-treated studs and joists inside the walls, copper-treated sills on the concrete: termite and decay resistance for a Temple City frame after fire.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

For new studs, joists and plates in a Temple City frame rebuilt after a fire, borate-treated lumber is a choice worth pricing. The borate soaks into the wood and stops termites and decay fungi from feeding on it, which matters in walls nobody will open again for a long time. It suits framing kept dry inside the house. The sill on the concrete gets a copper-based pressure treatment, which holds up where moisture can reach it.

Where borate fits and where it does not

Borate stays in wood that stays dry. Studs, joists and top plates inside the finished walls qualify, and so does blocking. Anything that can get wet again and again, such as a deck ledger, an exterior post or the sill on the concrete, takes a pressure treatment that will not wash out. The engineer notes each treatment on the drawings, and the lumber arrives stamped so the inspector can check it. Cut ends of treated pieces get a brushed-on preservative, since cutting exposes wood the treatment may not have reached.

Inspection and the rest of the repair

The treated lumber changes the material, and the steps stay the same. Plan check for a Temple City permit reviews the engineer's set before work begins, and the framing inspector checks lumber stamps, hangers, hold-downs and nailing while the walls are open. We note the treatment for each part of the frame in the written scope, so the cost of the upgrade sits apart from the rest. A termite inspection of the untouched parts of the house can run alongside, since new wood placed beside infested old wood helps no one.

About our Structural Work serviceEverything we build in Temple City

Structural Work in Temple City: questions

Plan your project in Temple City

Tell us about the property and what you have in mind. We reply with a written next step.