New Construction in Sylmar, Drawn for Stormwater Review

A new Sylmar house drawn for the stormwater review, with roof water routed to lined planters, a cistern, porous paving or an infiltration pit.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Plan review for a new Sylmar house includes a stormwater check, and LADBS holds the permit until it clears. The reviewer traces each downspout on the site plan and asks where that water goes. Los Angeles expects new homes to keep part of their runoff on the lot, through a filtering planter, a cistern, porous paving or an infiltration pit. We settle that route early, while the footprint can still move.

Sizing the devices

Each device is sized against the roof and paved area that drains into it. Infiltration only works where the ground accepts water, so the soils engineer can run a percolation test in the same borings drilled for the foundation design. Tight clay or a high water table points toward lined planters, which hold runoff in a soil bed and send the overflow to the street through a pipe. Where the ground drains well, an infiltration pit is placed a set distance from the footings so soaked soil never weakens them. Porous pavers on the driveway shrink the area the other devices have to handle.

Inspection, upkeep and the fire map

Liners, gravel, overflow pipes and cleanouts are inspected while they are still open, since nothing can be checked once soil and plants cover them. At final, the inspector confirms every downspout lands where the plan says. The city may also ask for a recorded covenant that keeps the devices working for later owners. Parts of Sylmar are mapped as fire hazard areas, where ember-resistant roofing, vent screens and enclosed eaves can be required, so we confirm the mapping before anyone draws the planting plan. At handover you get a short sheet on what to clear out after a storm.

About our New Construction serviceEverything we build in Sylmar

New Construction in Sylmar: questions

Plan your project in Sylmar

Tell us about the property and what you have in mind. We reply with a written next step.