Rebuilding in Sylmar, Los Angeles County

Fire rebuild in Sylmar

Sylmar fire rebuild prepared for LADBS plan check: structural, energy, green building and ember resistant sheets complete before the set goes in.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add what you are interested in, your first name and a phone number or an email.

Plan check for a Sylmar rebuild happens at LADBS, the Los Angeles Department of Building and Safety. Its reviewers read the structural design, the energy calculations, the green building checklist and, for a lot on mapped fire hazard ground, the ember resistant exterior. A missing sheet in any of those sends the whole set back with comments, so we assemble every part and cross check them against each other before submittal.

What the energy and green sheets show

The state energy code limits heat gain and loss through the walls, roof and windows, and an energy consultant models the house to show it complies. The model sets insulation levels, window performance and duct sealing, and a new house also carries a solar electric system sized under the same rules. The green building code adds water saving fixtures, a circuit ready for an electric vehicle charger and a plan for recycling construction waste. Field inspectors confirm these items as the work goes in, and a third party may test duct leakage before final.

Ember resistant details at review

Some Sylmar parcels lie on mapped fire hazard ground. For one of them, the reviewer expects a Class A roof, vents built to keep out embers, eaves closed off with a rated soffit and exterior walls of noncombustible or ignition resistant cladding. Gutters, decks near the house and the edges of garage doors come under the same chapter of the code. We mark each requirement on the sheet where it applies, so a reviewer comment points to one detail and its correction is easy to trace. Inspectors then confirm the installed parts at the roof and final inspections.

Start your Sylmar project with a lot visit

Send the address and where things stand. We reply with the next step.