Fire Rebuild & Reconstruction in Sylmar

Sylmar fire rebuild whose site plan starts from a new boundary survey: setbacks, drainage and fire access set out for LADBS, then the build.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

The site plan is the first sheet an LADBS reviewer reads on a Sylmar rebuild. It shows where the house sits against the property lines, how the driveway reaches it, where water drains and how far the walls stand from neighboring buildings. Every other sheet depends on that page, so we base it on a new boundary survey and check it against zoning before the full set goes in.

What the site plan has to show

Setbacks are dimensioned from each property line to the walls and eaves facing it. The plan marks existing and new utilities, the sewer connection, any easement and the finished floor height against the surrounding grade. Drainage arrows show water moving away from the house to an approved outlet. If the parcel sits in a very high fire hazard area on the state or city maps, the fire department may check driveway width, turnaround space and hydrant placement, and those notes go on the same sheet so every reviewer sees one consistent drawing.

Comments and the rest of the set

Once the site plan holds, the reviewer moves on to structure, energy and the ember-resistant exterior a mapped Sylmar parcel requires: a Class A roof, ember-blocking vents, ignition-resistant siding and tempered glazing. The checker's comments come back on a correction sheet, and we answer each one with the revised drawing attached. Grading beyond minor work may need its own review and a soils report. Fees and engineering for each review are priced as separate lines, so nothing in the permit stage is hidden.

About our Fire Rebuild & Reconstruction serviceEverything we build in Sylmar

Fire Rebuild & Reconstruction in Sylmar: questions

Plan your project in Sylmar

Tell us about the property and what you have in mind. We reply with a written next step.