New Construction in Rancho Palos Verdes, With Radiant Floors Planned In

Heated floors in a new Rancho Palos Verdes house work when the tubing, heat pump and floor finishes are all settled before the slab is poured.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Will heated floors work in a new house? On a cleared Rancho Palos Verdes lot they will, as long as the decision comes before the concrete is ordered. Radiant tubing is cast inside the slab or fixed under the subfloor, so it shapes the foundation and the framing alike. We settle the heat pump, the zones and the floor finishes as one package while every change is still a line on paper.

Tubing in a slab or under a floor

On a slab, rigid foam goes down over the vapor retarder first so heat moves up into the room and little is lost to the ground. PEX tubing is then tied to the reinforcing in loops of matched length, which lets each loop return water at an even temperature. The loops stay pressurized through the pour, and a gauge shows at once if a line is nicked. Over a raised floor, the tubing runs in aluminum plates fastened to the underside of the subfloor between the joists.

Heat pump, zones and finishes

An air-to-water heat pump can feed the loops, and some models also heat the domestic water where the design permits. Each zone has its own thermostat and its own circuit at the manifold, so bedrooms can run cooler than the living space. Tile and polished concrete pass heat readily, while thick carpet with pad holds it back. Engineered wood works when its maker approves it over radiant heat. Near the ocean, a warm slab also keeps a tile floor from feeling damp underfoot.

About our New Construction serviceEverything we build in Rancho Palos Verdes

New Construction in Rancho Palos Verdes: questions

Plan your project in Rancho Palos Verdes

Tell us about the property and what you have in mind. We reply with a written next step.