Rancho Palos Verdes Structural Work and the Soils Question

Rancho Palos Verdes structural work after a fire, starting with whether a soils report is needed, since it sets how footings, walls and frame are designed.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Do we need a soils report before anything is drawn? On a fire-damaged Rancho Palos Verdes property that question deserves an early answer, because it decides how the footings are designed. A geotechnical engineer bores or digs test holes, studies how the soil acts when wet and when dry, and issues bearing values. The structural engineer designs to those numbers, and the building department may require the report outright.

What brings on a soils report

Building officials and engineers ask for a soils report when the load on the ground changes: a new foundation, a larger footprint, an extra story, a retaining wall. Evidence that the old house moved is another trigger, such as stair-step cracks in block or concrete, or floors that sloped before the fire. On a sloping lot, the report also fixes footing depth and how far footings sit back from the face. A reused foundation still deserves a look underneath, since water poured on during the fire can leave the soil beside it soft.

Turning the report into drawings

With the bearing values and any expansion findings in hand, the structural engineer sizes footings, grade beams or drilled piers. The report's drainage advice goes onto the plans as well, because soil kept wet loses strength and pushes harder on walls. Rancho Palos Verdes building and safety staff read the soils report next to the structural set during plan check. Before concrete, the inspector may want a letter from the geotechnical engineer confirming that the open trenches reached suitable bearing material.

About our Structural Work serviceEverything we build in Rancho Palos Verdes

Structural Work in Rancho Palos Verdes: questions

Plan your project in Rancho Palos Verdes

Tell us about the property and what you have in mind. We reply with a written next step.