Fire Rebuild & Reconstruction in Rancho Palos Verdes

Rancho Palos Verdes fire rebuild that settles the solar question early: required array size, clear roof area, firefighter pathways and a battery-ready panel.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

"Does the new house have to carry solar?" For a full rebuild in Rancho Palos Verdes, the state energy code generally says yes, and the energy report sets how much. We want that number before the roof is designed, so the array gets an open, sunny face, the electrical panel has room for a battery later, and the whole system appears as its own section of the written scope.

Where the panels go

The energy consultant models the house and reports a minimum array size. On the roof plan we keep that area free of vents, skylights and flues, and leave the clear paths along ridges and edges that firefighters need. Faces that get the most sun come first, and shade from trees or a neighbor's house is checked on site. In salt air, racking and fasteners are stainless or coated aluminum, and every attachment through the roof is flashed into the underlayment.

Panel, battery and utility approval

The current energy code also asks new homes to be ready for battery storage. We size the main panel for the solar feed, a future battery and electric appliances, and run conduit to a likely battery spot. The utility's interconnection request is filed while the frame goes up, since the system cannot be switched on until the utility approves it. Plan review compares the array layout to the roof plan, and the inspector sees the wiring before walls close. Each part is priced separately.

About our Fire Rebuild & Reconstruction serviceEverything we build in Rancho Palos Verdes

Fire Rebuild & Reconstruction in Rancho Palos Verdes: questions

More we build in Rancho Palos Verdes

Plan your project in Rancho Palos Verdes

Tell us about the property and what you have in mind. We reply with a written next step.