New Construction in Panorama City

New house construction in Panorama City that checks the street frontage first: possible dedications, curb and sidewalk work, driveway and tree permits.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Will the city make me rebuild the sidewalk? It is a reasonable thing to ask on a first visit to a Panorama City lot, because a new house in the City of Los Angeles can trigger a review of the street frontage. Depending on the street, the Bureau of Engineering may call for a strip of land to be dedicated or for curb, gutter and sidewalk work. We check that before the house is designed.

Street frontage and dedications

Some streets in Los Angeles are narrower than the city's plan for them, and new construction along such a street can require the owner to dedicate a strip at the front property line. Where curb, gutter or sidewalk is missing or damaged, the city may also ask for improvements built under a separate permit from the Bureau of Engineering. We request the street standard for your address early, since a dedication can change the front yard depth and push the house back on the lot. That adjustment is far easier on a sketch than on a permit set.

Driveways, trees and the curb

A new driveway approach is also permitted through the street side of the city, and its width and location must respect the curb, any utility poles and street trees. A parkway tree near the planned driveway may need its own review before removal or protection during the work. We draw the approach, the walkway and the utility trenches on one site plan so the street reviewers and LADBS see the same layout. That keeps the frontage permits moving alongside the building permit, and the costs of both appear on the quote.

About our New Construction serviceEverything we build in Panorama City

New Construction in Panorama City: questions

Plan your project in Panorama City

Tell us about the property and what you have in mind. We reply with a written next step.