Fire Rebuild & Reconstruction in Panorama City

Panorama City fire rebuild that settles the shared fence early: the survey line, a written agreement with the neighbor and a gate wide enough for the build.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Who rebuilds the fence along the side yard, and where exactly should it stand? On a burned Panorama City lot, a boundary fence may be gone, scorched or leaning, and the neighbor has a stake in it as well. We start from the survey line, talk through the options with you and the neighbor, and put the fence, its gate and its share of the cost into the written scope.

Finding the line first

An old fence may not sit on the property line at all. The boundary survey ordered for the rebuild marks the corners, and we compare the old posts with those marks before anyone digs new holes. If the posts wandered onto either lot, the open yard is the moment to settle it with the neighbor. Location, height, material and who pays are written down and signed by both owners, so each side has the same record to point to once the new fence is up.

Material, height and a gate for the build

A block wall or a metal fence will not carry flame along the yard the way dry wood can, and either is worth pricing beside a wood fence. Height limits come from the zoning for the parcel. A masonry wall, or one that also holds back soil, generally needs a permit and engineering through LADBS. During construction, a wide gate or a removable panel lets trucks, the concrete pump and lumber deliveries reach the pad. The fence is priced as site work, separate from the house.

About our Fire Rebuild & Reconstruction serviceEverything we build in Panorama City

Fire Rebuild & Reconstruction in Panorama City: questions

Fire Rebuild & Reconstruction in other cities

Plan your project in Panorama City

Tell us about the property and what you have in mind. We reply with a written next step.