Structural Work in Monrovia, Dry at the Foundation

Foundation walls holding back soil under a Monrovia house get membranes, drainage board and a footing drain, with fire-damaged framing rebuilt on top.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

If the lot slopes and part of a Monrovia house steps down with it, a foundation wall may be holding back soil on one side. Water gathering behind that wall pushes on it and can seep into the framing resting on top. During a fire repair, we expose the soil face where we can, apply a waterproof membrane and drainage board, and lay a perforated pipe at the footing to lead the water away.

When the wall itself needs work

A wall that holds back soil is a retaining structure, and cracks, a lean or rust stains from the steel inside it point to trouble. The engineer judges whether it can be repaired with new steel and concrete, braced from the inside, or replaced. Water is part of every option: weep holes or a drain behind the wall relieve the pressure, and the sill and studs resting on top get treated wood with a membrane under the plate. Fire-damaged framing above the wall is repaired only once the base under it is sound.

Plan review, soils and embers

A retaining wall that supports a house needs an engineered design, and a soils report may come first, at the engineer's request. The structural set goes through plan review with those details, and the inspector looks at footing steel, drain pipe and membrane before backfill covers them. Where a Monrovia lot falls inside a mapped fire hazard zone, as some do, the rebuilt walls above may also need ember-resistant vents and siding, and the engineer counts the load those added layers bring.

About our Structural Work serviceEverything we build in Monrovia

Structural Work in Monrovia: questions

Plan your project in Monrovia

Tell us about the property and what you have in mind. We reply with a written next step.