New Construction in Brentwood, With Rooms Below

Basement planning for a new Brentwood house, settled before design: borings, shoring along the property lines, waterproofing and livable rooms below grade.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

"Can we add a level below ground?" Asked at the first site visit on a cleared Brentwood lot, it gets a measured reply: possibly, once the borings, the distance to each property line and the City of Los Angeles floor area rules have been checked. We want that answer before anyone sketches, since a basement reshapes the dig, the shoring, the waterproofing and the height of every floor above it.

Holding the sides of the dig

Excavating for a basement leaves a deep hole close to the property lines. The geotechnical engineer sets how steeply the cut may stand, and where there is no room to lay it back, a shoring engineer designs soldier piles with lagging between them. Neighbors along an affected line get notice before the dig begins, and their footings are located so the design accounts for them. If the borings meet groundwater, the plan changes: dewatering during construction and a heavier waterproofing system on every buried wall. LADBS reviews the shoring drawings as a set of their own.

Rooms that feel like rooms

Below grade, every sleeping room needs daylight, fresh air and a way out. A light well with an egress window does all three, and each well gets its own drain. Soil around a buried room stays cool and damp, so mechanical ventilation and dehumidification go into the design from the start. The membrane wraps the walls and continues under the slab, and the sump pump carries a backup. A basement brings no exemption from the ember rules: on a Brentwood parcel that the fire hazard maps include, the roof, vents and walls above still follow them.

About our New Construction serviceEverything we build in Brentwood

New Construction in Brentwood: questions

Plan your project in Brentwood

Tell us about the property and what you have in mind. We reply with a written next step.