New Construction in Palms, With Leaks Planned Out
New house construction in Palms with drained pans, an automatic main shutoff and plumbing routed so an indoor leak is found fast and kept out of the framing.
Water can harm a new house from the inside as easily as from above: a supply line that lets go, a water heater that weeps, a washer hose that splits. On a new Palms house rebuilt from the slab up, we design for that. Every appliance that holds water sits in a drained pan, the main line can get an automatic shutoff, and the plumbing is laid out so a leak shows itself quickly.
Pans, drains and shutoffs
A drained pan goes under the water heater, piped to a floor drain or to daylight, and a laundry on an upper floor gets the same. Refrigerator and dishwasher lines use braided supply hoses with quarter turn valves within reach. We can add a leak sensor at each wet appliance, wired to a valve on the main that closes when water is detected. Shutoff valves for each bathroom are placed where they can be reached without tools, and the main valve is labeled and kept clear of storage.
Where the pipes run
Supply pipes stay out of exterior walls where the plan allows, and drain lines from an upper bath run in a chase over a closet or hall, so a slow leak appears where it can be found. Showers get a waterproof membrane that is flood tested before tile. The plumber pressure tests every line during rough-in, and LADBS inspects the system before insulation hides it. The condensate line from the air handler drains by gravity to an approved spot, with a float switch that shuts the unit off if it backs up.
About our New Construction serviceEverything we build in Palms
New Construction in Palms: questions
For this kind of house, plumbing questions matter early: where the water meter and the sewer connection sit, and whether the earlier house had leaks or backups. Send the boundary survey and soils findings with it, plus height and coverage limits, and any LADBS records for the old house.
Two written agreements carry the project. Design coordination, engineering, energy work and the LADBS permit sit in the first. The second prices the construction from approved drawings, moving in order from foundation to final inspection, with a short written update each time an inspection passes.
Our team keeps them moving together. Boundary data reaches the soils engineer, both reports reach the structural engineer, and the plumbing designer draws from the final floor plan. Questions raised at LADBS plan check come to us and are passed to whichever consultant can resolve them.