Fire Rebuild & Reconstruction in Brentwood
Brentwood fire rebuild that reads the old drawings as a record, then redraws structure, exterior and energy work to current code for LADBS review.
"Can the drawings from the old house be used again?" You may still have a set, or the permit file at LADBS may hold one, and it is a sensible thing to raise when we first meet on a cleared Brentwood lot. Old sheets are a useful record of size, rooms and placement. They were drawn to an earlier code, though, so structure, exterior and energy work are redrawn before anything is submitted.
What the old plans can still do
An old set shows where walls stood, how high the roof rose and where the house sat against the property lines. That helps the architect, and it helps you recall rooms you want back. It also gives the adjuster a document for the size of what was lost. What it cannot do is pass plan check today. Shear walls, hold-downs and footing sizes follow current engineering, and an energy report and sprinkler layout are likely missing from an older set. We compare the old sheets with a new survey before design starts.
Embers and damp air on the new sheets
Parts of Brentwood fall within mapped fire hazard areas. For a parcel inside one, the exterior sheet calls for Class A roof covering, vents tested against embers and flame, multipane glazing with a tempered layer, and siding that resists ignition. Brentwood is also a coastal area, and moist, salty air works on bare steel, so exposed fasteners, straps and flashing are specified in stainless or a heavy coating. LADBS checks those notes at plan check, and its inspectors match the installed products to the approved set.
About our Fire Rebuild & Reconstruction serviceEverything we build in Brentwood
Fire Rebuild & Reconstruction in Brentwood: questions
Send us the address once debris removal is complete and signed off. On the visit we look over the slab and utilities, ask about any old drawings you hold and order the permit history. From those, we write a scope that sets the design, the engineering and each building stage in order.
Line by line, yes. The estimate moves in construction sequence from grading through paint, and every entry spells out what it covers. Items the old house lacked, such as sprinklers or ember-rated vents, are grouped apart from like-for-like work, which lets you and the adjuster see which costs current code added.
The edition of the Los Angeles code current at permit issue sets the baseline, and a new house gets automatic sprinklers under it. On a hazard-mapped parcel, the outside is built to keep embers out with a Class A roof, ember-tested vents, tempered glass in the windows and siding and decks that resist ignition.
Fire Rebuild & Reconstruction in other cities
More we build in Brentwood
Plan your project in Brentwood
Tell us about the property and what you have in mind. We reply with a written next step.