New Construction in Bel Air, Roofed in Concrete Tile

New house construction in Bel Air under a concrete tile roof on a Class A assembly, with bird stops at the eaves and listed vents to keep embers out.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Concrete tile over a Class A rated assembly is the roof we put on a new Bel Air house. The tile will not burn, which counts because fire hazard maps take in sections of Bel Air. Its weak spots are the openings: the curved ends at the eaves and the vents near the ridge. Metal bird stops close those ends, and vents listed for ember resistance let the attic breathe without drawing sparks in.

Layers under the tile

A Class A rating belongs to the whole roof, so the layers beneath the tile count as much as the tile. Over the sheathing we lay a mineral-surfaced cap sheet, then battens, then the tile fastened on the pattern its listing shows. Valleys are lined with wide metal that runs over the cap sheet. At each eave a metal bird stop fills the gap under the first course and keeps embers, leaves and nesting birds out. The structural engineer sizes the rafters for the weight, which runs well above that of a shingle roof.

Checks and care later

LADBS checks the roof listing, the rafter sizes and the vent products at plan check. In the field, the inspector sees the cap sheet before tile goes on and the bird stops and vents at the end. Concrete tile lasts a long time, though the layer under it ages first, so we record its product name for whoever reroofs the house someday. Metal guards keep leaves out of the gutters. Tile cracks under careless feet, so the closeout papers show where a roofer can walk safely.

About our New Construction serviceEverything we build in Bel Air

New Construction in Bel Air: questions

Plan your project in Bel Air

Tell us about the property and what you have in mind. We reply with a written next step.