New Construction on Your Santa Monica Lot

New house construction in Santa Monica with hot-dip galvanized or stainless connectors, matched fasteners and siding chosen to stand up to salt air.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

For the structural hardware on a new Santa Monica house, we specify hot-dip galvanized or stainless steel connectors. Salt carried on damp coastal air settles on metal and eats through thin plating, and the straps, hangers and hold-downs that tie a frame together are hard to reach once walls close. Heavier zinc or stainless steel gives those parts a long working life, and matching fasteners keep the two metals from corroding each other.

Choosing the hardware

Connector makers sell the same strap in several coatings. Standard thin galvanizing suits interior framing well away from the weather. Near the coast, any connector in an exterior wall, a deck, a balcony or the crawlspace moves up to a heavy zinc coating or stainless steel. Nails and screws must match the connector: a stainless strap held with plain steel nails will rust at the nail heads. Treated lumber adds its own chemistry, which is one more reason to step up the coating. The structural engineer notes the required finish on the plans so the order arrives right.

Siding, flashing and the review

The same thinking carries to the outer skin. Fiber cement siding and three-coat stucco both stand up to salt air, and the trim, flashing and vents beside them come in aluminum with a factory finish or in stainless steel. Copper and galvanized flashing are kept apart so they do not react. Santa Monica's building and safety staff review the structural sheets, and if your parcel turns out to sit inside the coastal zone, a separate approval joins the schedule, so we settle that question before design. The inspector sees the hardware at the frame inspection.

About our New Construction serviceEverything we build in Santa Monica

New Construction in Santa Monica: questions

Plan your project in Santa Monica

Tell us about the property and what you have in mind. We reply with a written next step.