Fire Rebuild & Reconstruction in Mission Hills

Mission Hills fire rebuild that traces buried gas, power and water lines to outbuildings before quoting, with any repair priced and permitted through LADBS.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Lines buried between the house and a detached garage, a pool or a backyard shed are easy to miss on a cleared Mission Hills lot. Gas, power and water may have run underground to those structures, and fire heat or heavy equipment can damage them out of sight. We trace and test each run before quoting, because a live line left in place or a crushed one found during grading changes the site work.

Finding what runs underground

We start with the old permit file and any site plan it holds, then walk the lot with a locator to mark buried runs. A plumber caps each yard gas run where it leaves the meter and puts it under a pressure test, and an electrician confirms that any feeder to an outbuilding is dead and identified. Water lines to hose bibs or a pool are traced back to the main. Each run is marked on the survey, with its depth noted wherever a small hole exposes it, and the findings go into the assessment with a photo of each.

What a buried line changes

A yard gas run that leaks is cut off at the meter and left abandoned, and a fresh line goes in only if the new plans call for gas at a grill, heater or outbuilding. A damaged electrical feeder comes out, and any new circuit to a garage or pool follows current wiring rules in its own conduit. A water line under the new footprint is rerouted before the slab. We price every one of these on its own line and attach the test that found it. LADBS issues the permits for the new runs and inspects the trenches before they are backfilled.

About our Fire Rebuild & Reconstruction serviceEverything we build in Mission Hills

Fire Rebuild & Reconstruction in Mission Hills: questions

Fire Rebuild & Reconstruction in other cities

Plan your project in Mission Hills

Tell us about the property and what you have in mind. We reply with a written next step.