Fire Rebuild & Reconstruction in Downey

Downey fire rebuild that tests the underground electric service to the old meter, since heat damage to the conduit or wire changes trenching and utility work.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Fire at the back of an old Downey meter base can reach into the conduit below it, softening plastic pipe and breaking down the insulation on the wire inside, with nothing to see at the surface. We open the meter base, look at the riser and arrange an insulation test on the service conductors before the scope is written, because a failed service means a new trench and a request to the utility.

Testing the service

We look at the riser for cracked or melted conduit, loose fittings and scorched wire, and ask the utility which parts of the run belong to it and which to the owner. An electrician can test the conductors with a meter that applies voltage and measures leakage through the insulation. Even a sound service may be too small for a new house with a heat pump, electric cooking, a vehicle charger and solar, which the load calculation shows. Either way the result is written into the scope with the test record attached.

If the old service cannot stay

A replacement underground service follows the utility's design, with a trench, conduit size and depth set to its standards and an inspection before backfill. We file the service request as soon as the panel size is known, since the utility's design runs on its own track, and temporary power for construction goes on a separate pole until then. The meter may move to suit the new floor plan and the panel location. Trenching, conduit, the panel and any utility charges are each priced on their own line.

About our Fire Rebuild & Reconstruction serviceEverything we build in Downey

Fire Rebuild & Reconstruction in Downey: questions

Fire Rebuild & Reconstruction in other cities

Plan your project in Downey

Tell us about the property and what you have in mind. We reply with a written next step.