Valley Glen Structural Work and the Repair Threshold

Repair or upgrade? Valley Glen structural work that measures fire damage to the bracing walls against the code threshold, with LADBS review.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Damage to the walls that brace a house against earthquakes gets weighed against a threshold when LADBS reviews a Valley Glen fire repair. Under the state's existing building code, limited damage can usually be put back to its former condition. Heavier damage to those bracing walls brings an engineer's evaluation of the whole lateral system, and upgrades may follow. The reviewer expects the drawings to say which case applies and why.

Measuring how much bracing the fire took

The engineer needs a count. We map every braced wall in the house, mark the lengths that burned, lost sheathing or were soaked through, and photograph each one with the room labeled. Hold-downs and straps that went through heat are listed separately, since heat can strip their coating and weaken the metal. From that map the engineer works out how much of the lateral system was damaged and whether the repair crosses the line that calls for a wider evaluation. The map and the engineer's conclusion both become part of the written scope you receive.

The Valley Glen submittal and its review

A complete package keeps plan check focused. It holds the damage map, the engineer's letter on the threshold, calculations for each repaired member, and details for any upgrade the evaluation requires. LADBS may return questions about how the damage was measured, and the engineer answers them in writing, with revised sheets where needed. After approval, field inspections track the drawings, from new footing steel to the nailing on each braced panel. If the walls reveal more damage once opened, the engineer updates the evaluation and LADBS sees the revision.

About our Structural Work serviceEverything we build in Valley Glen

Structural Work in Valley Glen: questions

Plan your project in Valley Glen

Tell us about the property and what you have in mind. We reply with a written next step.