El Segundo ADU Construction, Set by the Sewer

El Segundo ADU construction placed by the sewer: fixture heights against the upstream manhole, a backwater valve where needed and City of El Segundo review.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

The sewer main under an El Segundo street has manholes along it, and the cover of the next one upstream matters to a new ADU. If the rims of the unit's fixtures would sit below that cover, plumbing code requires a backwater valve on their drain so a surcharged main cannot push sewage into the shower. So we take that cover height early and set the unit, and its floor level, with it in mind.

When a backwater valve goes in

Inside the building drain, a backwater valve works as a flap that closes when sewage flows the wrong way. It needs an access box at grade so it can be opened and serviced, which means it cannot sit under the unit's slab or a patio. Where only some fixtures fall below the manhole cover, the valve protects just those, and fixtures set higher drain past it. The unit's drain then ties into the lateral that will also serve the house, with an access point at the junction. Raising the floor a little can sometimes avoid the valve, and we compare both.

City of El Segundo plan check

An El Segundo ADU is filed with the city's building staff, who read the plumbing along with the structure. The plan checker looks for the manhole cover reference, the fixture heights, the valve and its access box, and the slope of the line to the lateral. The parcel record also settles the coastal zone question before filing. In the field, the inspector sees the drain line hold a water or air test before the trench is closed. Outdoors near the water, cleanout covers and valve lids are plastic or bronze, so damp, salty air cannot seize them.

About our ADU Construction serviceEverything we build in El Segundo

ADU Construction in El Segundo: questions

Plan your project in El Segundo

Tell us about the property and what you have in mind. We reply with a written next step.