ADU Construction in Playa Vista, Ready for LADBS Review

Playa Vista ADU construction drawn for LADBS review, with the coastal zone checked by parcel and walls built to drain and dry close to the coast.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Plan review for a Playa Vista ADU happens at LADBS, which serves the City of Los Angeles, and the reviewer's first question is whether the unit's size, height and position are shown the same way on every sheet. On a lot cleared by fire, the drawings also place the future house, so the reviewer can confirm the ADU leaves it room and that one utility trench can serve both. You get a permitted unit to live in during the rebuild.

Coastal zone first, then plan check

Some Playa Vista parcels may fall inside the state coastal zone, and we confirm the status for your address before filing. Where it applies, the building permit cannot be issued until the coastal clearance or an exemption is in hand, though plan check can often move forward at the same time. Beyond that, the reviewer checks how the foundation and frame carry their loads and whether insulation, glazing and heating meet the state energy code. Each correction is answered on revised sheets, and we tell you where the file stands as it moves.

Walls that can dry

A wall near the coast is best built on the assumption that some moisture will get behind the siding. For a Playa Vista ADU we leave a vented rainscreen gap so that moisture can drain and dry, lap the window flashing so each upper piece sheds over the one below, and use stainless screws at exterior trim where salt air would stain or loosen plain steel. Indoors, the bath fan and the range hood both vent outside the building. Every item appears in the written scope with a line of its own, so you can see what each adds.

About our ADU Construction serviceEverything we build in Playa Vista

ADU Construction in Playa Vista: questions

Plan your project in Playa Vista

Tell us about the property and what you have in mind. We reply with a written next step.