Structural Work in El Segundo Where a Bearing Wall Went Missing

Fire-damaged ceilings in an El Segundo house can reveal joists lapped over a wall an old remodel removed. Finding that adds a beam, posts and footings.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Ceiling drywall that comes down after a fire in an El Segundo house can reveal joists lapped together over empty air, where a bearing wall once stood. An earlier remodel may have opened two rooms into one without adding a beam, leaving the joists to span farther than they were built for. That discovery reshapes the repair: a beam, a post at each end and footings under the posts join the scope before any new ceiling goes up.

Reading the clues above the ceiling

Joists that overlap in the middle of a room with no wall beneath them are the plainest sign. Others include a ceiling that dips toward the room's center, drywall tape cracked along that line, and nearby doors that rub at the top. We measure the sag with a laser line, record joist size and spacing, and look at the roof framing above for struts that once bore on the missing wall. On a coastal lot, damp air in a vented attic can corrode the nails at those laps, so we test how tightly each joint still holds.

Putting a beam where the wall was

The engineer sizes a beam to carry the joists, either dropped below the ceiling line or set flush with joist hangers so the ceiling stays flat. Each end needs a post, and each post needs something solid beneath it, which often means cutting the slab for a new footing. Temporary shoring holds the ceiling while the beam goes in. Plan review covers the calculations, and the field inspector looks at the footing excavation and steel ahead of the pour and at the hangers ahead of drywall. You see the beam, the posts and the footings as their own lines in the quote, apart from the fire repair.

About our Structural Work serviceEverything we build in El Segundo

Structural Work in El Segundo: questions

Plan your project in El Segundo

Tell us about the property and what you have in mind. We reply with a written next step.