Marina del Rey ADU Construction, Planned From the Curb In

Marina del Rey ADU construction for a rebuild: deliveries planned from where a truck can stop, county permits and inspections, hardware chosen to resist salt.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Where a delivery truck can stop sets the start of the route materials take to the back of a Marina del Rey lot. A flatbed carrying lumber needs room at the curb to unload, and a concrete truck or pump needs a place to stand while the slab is poured. We look at the street frontage, any alley and the parking rules first, then trace the path from there to the unit site, measuring every gate and turn.

From the truck to the unit site

A forklift carried on the truck can set pallets inside the lot line when the driveway is open. Otherwise loads are broken down at the curb and moved by cart, so drywall, doors and the shower pan are ordered in sizes that clear the narrowest point of the path. Long pieces such as beams move most easily along a straight path, and where the path bends, we plan a lift over the gap from the street. If a bin or a pump has to stand in the roadway, the county's permit for that is arranged before the delivery.

County review and corrosion near the water

Marina del Rey is unincorporated, and Los Angeles County Public Works handles plan check and inspections for a unit there. A coastal development permit may also be required, depending on the parcel, so we ask the county early which path your lot is on. Close to the ocean, bare steel rusts quickly in damp air, so metal connectors and nails exposed beyond the water-resistive barrier are stainless or heavily galvanized, and flashing is a metal that will not react with them. Stored materials sit on blocking under cover, so they reach the wall dry and clean.

About our ADU Construction serviceEverything we build in Marina del Rey

ADU Construction in Marina del Rey: questions

Plan your project in Marina del Rey

Tell us about the property and what you have in mind. We reply with a written next step.