Hidden Hills Structural Work at the Garage Wall

Garage ceilings, door headers and the narrow walls beside them opened first: Hidden Hills structural work after a fire, with ember rules checked.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

A section of garage ceiling comes down at our first visit to a Hidden Hills house with an attached garage, ahead of any price. Drywall there is meant to slow fire between the garage and the rooms beside it, and where it gave way, the joists above can be charred. We probe those joists, measure the header over the garage door for sag, and look for plywood and hold-downs on the narrow walls beside the door.

Garage door headers and the walls beside them

A wide garage door leaves short lengths of wall on either side, and those short walls do a large share of bracing the front of the house. If heat or water weakened them, or they were never braced well, the engineer may call for a new header, longer hold-downs or a manufactured braced frame sized for the narrow space. A room above the garage adds load to the header and joists. Once repairs are framed, the separation drywall goes back with fire-rated board where the code calls for it, and the inspector sees it before finishing.

What the hazard map adds to a Hidden Hills rebuild

Some Hidden Hills lots fall within mapped fire hazard zones, where ember-resistance rules can apply to vents, eaves and exterior walls during a repair or rebuild. Those rules affect framing, since enclosed eaves need blocking and heavier cladding needs walls able to carry it. We confirm with the designer which rules apply before the structural drawings are final. The building department serving Hidden Hills reviews the engineer's calculations with the plans, and inspections follow footing steel, framing and hardware in turn.

About our Structural Work serviceEverything we build in Hidden Hills

Structural Work in Hidden Hills: questions

Plan your project in Hidden Hills

Tell us about the property and what you have in mind. We reply with a written next step.