ADU Construction in Mission Hills, Placed by the Sewer

Mission Hills ADU construction placed by its sewer lateral: depth found at the cleanout, a drain that falls by gravity, LADBS review and inspected stages.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

The depth of the sewer lateral where it leaves a Mission Hills house site sets how far back an ADU can sit and still drain by gravity. Wastewater needs a steady fall, about a quarter inch for each foot of pipe, so a long run uses up depth fast. We open the cleanout, measure down to the pipe and run a camera along it, then mark the farthest point a gravity drain can reach.

When the back of the lot sits too low

If the preferred spot falls past that mark, we look at three fixes. The unit's floor can be raised a little to win back fall. The unit can move closer to where the lateral leaves the lot. Or its drain can run to a sealed pump basin that lifts wastewater up to the lateral, which works but adds a pump to maintain and a circuit to feed. After a fire, the camera also shows whether heat, debris or demolition cracked the old line, and a cracked line is replaced before anything new connects to it.

LADBS review of the drain

LADBS reviews the ADU's plumbing as part of the permit set, including the drain size, its slope and the point where the new line joins the lateral. A unit may share the existing lateral or, where the city calls for it, get a separate connection. The trench is inspected open with the pipe laid on its grade, and the line is tested with water standing in it before backfill. Rough plumbing inside the walls gets its own test, and the final confirms that every fixture drains freely.

About our ADU Construction serviceEverything we build in Mission Hills

ADU Construction in Mission Hills: questions

Plan your project in Mission Hills

Tell us about the property and what you have in mind. We reply with a written next step.