Hermosa Beach Structural Work With a Second Story in Mind

Can a Hermosa Beach house repaired after a fire carry a second story later? Footings, walls and beams decide, and the engineer checks them during the repair.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Could this house take a second floor later, once the fire repairs are done? The time to settle it is while a Hermosa Beach frame stands open, because the answer lives in parts that will soon be covered: the footings, the walls of the lower floor and the beams over its widest rooms. An engineer can size the repair for the added weight now, so nothing has to be opened a second time.

Weight from above, traced down

A second story adds its floor, walls and roof to everything under it, and that weight travels down along particular paths. Bearing walls on the ground floor may need more studs or bigger headers. Beams over open rooms may need to grow. The footings, sized for one level, are checked against the soils information, and some may need to be widened or added. Braced walls on the lower floor also have to resist more sideways force in an earthquake. The engineer works through each path and tells you which pieces the fire repair can upgrade now with little extra effort.

Planning it with the repair

Zoning decides whether a second floor is allowed and how tall it can be, so we check those limits before the engineer designs for it. If the answer is yes, the repair drawings can carry the heavier footings, beams and hold-downs now, and the later addition gets its own permit when you are ready to build it. Parts sized ahead are priced apart from the fire repair, so the cost of getting ready is visible on its own. If the limits rule a second floor out, the repair is drawn for the house as it stands.

About our Structural Work serviceEverything we build in Hermosa Beach

Structural Work in Hermosa Beach: questions

Plan your project in Hermosa Beach

Tell us about the property and what you have in mind. We reply with a written next step.